• About
  • Advertise
  • Subscribe
  • Contact
  • List Your Equipment Today
Tuesday, February 17, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • Directory
No Results
View All Results
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • Directory
No Results
View All Results
Home

Victorian quarry industry secure – despite latest lockdown

by Henry Ballard
May 28, 2021
in Industry News, News, Regulation, Regulation News
Reading Time: 3 mins read
A A
The CCAA is 'pleased' that the Victorian Government will ensure that all Victorian quarries will continue to operate in the latest 'circuit breaker' lockdown.

The CCAA is 'pleased' that the Victorian Government will ensure that all Victorian quarries will continue to operate in the latest 'circuit breaker' lockdown.

Share on FacebookShare on Twitter

 

As Victoria temporarily endures another lockdown, the longevity of the quarry industry is assured, with $35.7 million allocated in the Victorian Budget for 2021-22.

As part of a $22.5 billion infrastructure pipeline over the next four years, the Budget will ensure Australia’s fastest growing state can maintain its lofty demands for growth.

More than 63 million tonnes of aggregate were delivered to Victoria’s infrastructure last financial year, according to Cement Concrete & Aggregates Australia (CCAA), Australia’s peak body for the heavy construction materials industry and a member of the Extractive Industry Taskforce.

A spokesperson for the CCAA stressed just how important continued investment in the sector is for Victoria.

“Cement, concrete, stone and sand remain the critical materials that enable Victoria’s construction industry – an industry that employs 340,000 workers and contributes 45 per cent of Victoria’s taxation revenue base,” the spokesperson stated.

“With the largest infrastructure build in the history of the state continuing, investment in Victoria’s extractive industry could never be more important.”

Of the $35.7 million, $13.4 million will go to the Geological Survey of Victoria to ensure continued investment in the sector as demand increases.

Earth Resources Regulation will benefit from $10.6 million to accelerate regulatory approvals for materials closest to the market, while $6.9 million will ensure the success of the Extractive Resource Roadmap and all the Strategic Extractive Resource Areas (SERAs) associated with it.

The Victorian Minister for Resources Jaclyn Symes said the economy was built on the success and output of quarries and would receive appropriate funding.

“The resources sector is a crucial part of our economic recovery – we want to ensure quarries can continue to provide the building blocks of our infrastructure program and create more jobs,” Symes said.

“We’re making sure that efficient and responsible regulation of the sector goes hand in hand with the development of future sites – including the local community in decision‑making and leaving a positive legacy.”

The CCAA, while pleased with the Budget’s focus on resources, had one eye on the state’s long-term growth, as extractive production is expected to reach 100 million tonnes by 2050 – double 2016 levels.

“The funding directed towards infrastructure and enabling the extractive industry is very welcome, but there is still much work to do to drive improvements around approvals of new materials to market,” its spokeperson stated.

“CCAA continues to work closely with the Victorian Government to ensure the money allocated makes a difference where it is needed, in enabling the whole industry to replenish supply.”

Building the bridge to recovery

While the CCAA has an influence on government budget allocations, the same cannot be said for its influence on snap-lockdown decisions as the waves of COVID-19 restrictions have hampered industries across the world.

In February 2021, CCAA chief executive officer emphasised the organisation’s stance on “circuit breaker lockdowns”.

Ken Slattery is the CEO of the CCAA.

“We call on governments to support the sector’s ongoing operations throughout these isolated outbreaks,” Slattery said. “The many thousands of Australians employed in building and construction are essential to the building of the very infrastructure that keeps us safe, from homes to schools, bridges to roads and of course, hospitals.

“The bridge to recovery post the pandemic will be built on a strong and viable building and construction sector.”

More recently, as Melbourne has once again entered a snap lockdown, this time at least seven days long, the CCAA commended the government for allowing operations such as quarries to remain up and running.

“CCAA has advocated strongly for the sector’s ongoing operations through State lockdowns,” its spokesperson stated.

“We are therefore very pleased to see that the Victorian Government has responded and adopted a position where construction, including our supply chain, can remain open in this latest circuit breaker lockdown.”

More reading

CCAA: COVID-Safe construction essential to Australia’s recovery

Tags: budgetCCAACOVID-19Earth Resources RegulatorKen Slatterylockdownresources sectorVictoria
Premium Ad
26

$205,000

2012 CATERPILLAR D6T LGP

  • » Listing Type: Used
  • » Class: Swamp
  • » Year: 2012
  • » Hours: 12500
  • » Operating Weight Without Ripper - kg: 24,000
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
15
Private Advertiser

$99,000

1979 KOMATSU D355A-3

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 1979
  • » Hours: 3993
  • » Operating Weight Without Ripper - kg: 53,000
Location marker The shape of a location marker

Taroom, QLD

**** *** 589
MORE DETAILS
Premium Ad
32

$435,000

2018 KOMATSU D85EXI-18

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2018
  • » Hours: 5030
Location marker The shape of a location marker

Fairfield East, NSW

02 8279 7104
MORE DETAILS
Premium Ad
34

$285,000

2010 CATERPILLAR D11T

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2010
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
Premium Ad
13

$1,355,000

CATERPILLAR D10T2

  • » Listing Type: Used
  • » Class: Crawler
  • » Hours: 7,965
Location marker The shape of a location marker

Wyoming, NSW

Location marker The shape of a location marker

Delivery Australia Wide

02 8999 5098
MORE DETAILS
Premium Ad
11

$330,000

2015 KOMATSU D85EX-15EO

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2015
  • » Hours: 2,950
Location marker The shape of a location marker

Campbellfield, VIC

03 8373 7162
MORE DETAILS
Premium Ad
32

$199,500

$2,700

per week (HIRE)

2018 KOMATSU D37EX-24

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2018
  • » Hours: 840
  • » Operating Weight Without Ripper - kg: 8,900
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
18

$1,030,000

2016 CATERPILLAR D9T

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2016
  • » Hours: 93
Location marker The shape of a location marker

Redland Bay, QLD

07 3171 1034
MORE DETAILS
Premium Ad
25

$250,000

1998 CATERPILLAR D10R

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 1998
  • » Hours: 39300
Location marker The shape of a location marker

Cranbourne North, VIC

0485 931 103
MORE DETAILS
Premium Ad
7
Private Advertiser

$55,000

1987 CASE 1150D

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 1987
  • » Hours: 4900
  • » Operating Weight Without Ripper - kg: 12,000
Location marker The shape of a location marker

Berry, NSW

**** *** 503
MORE DETAILS
Premium Ad
35

$440,000

2011 CATERPILLAR D8T

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2011
Location marker The shape of a location marker

Canobolas, NSW

02 6324 4710
MORE DETAILS
Premium Ad
17

$770,000

2023 CATERPILLAR D8T

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2023
  • » Hours: 2522
Location marker The shape of a location marker

Redland Bay, QLD

07 3171 1034
MORE DETAILS

Related Posts

Boral

Boral delivers Australian first low-carbon calcined clay concrete

by Daniel Williamson
February 17, 2026

Boral has completed development for what it says is Australia’s first low-carbon concrete incorporating locally sourced calcined clay. Boral chief...

Pacific lime and cement

Pacific Lime and Cement and Newmont shake hands

by Daniel Williamson
February 17, 2026

Pacific Lime and Cement Limited (PLC) has reached a milestone commercial agreement with global gold producer Newmont Corporation, securing a...

Quarry

Managing conflict in quarry teams

by Daniel Williamson
February 16, 2026

Quarry supervisors and team leaders are being urged to register for an upcoming professional development webinar focused on managing workplace...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Quarry is the official magazine of the Institute of Quarrying Australia (IQA), the peak body for the sector, and informs decision makers about the latest industry news.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Quarry

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • List Your Equipment Today
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Products
  • Operations
  • In Depth
  • Opinion

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • DIRECTORY
  • List Stock
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited