• About
  • Advertise
  • Subscribe
  • Contact
  • List Your Equipment Today
Saturday, December 13, 2025
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • Directory
No Results
View All Results
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • Directory
No Results
View All Results
Home News Environmental News

Master Plan edges old Hornsby Quarry closer to new life

by Henry Ballard
July 23, 2021
in Environmental News, Geology, Geology Talk, Industry News, News, Recycling
Reading Time: 2 mins read
A A
A projected image of Hornsby Park, with the old pit bench and diatreme walls in the background.

A projected image of Hornsby Park, with the old pit bench and diatreme walls in the background.

Share on FacebookShare on Twitter

 

Hornsby Shire Council has formally established a Master Plan for the $130 million Hornsby Park project, north of Sydney, after a period of extensive community consultation.

The project aims to transform a former quarry into “the Centennial Park of the north,” according to Hornsby Shire Mayor Philip Ruddock.

Latest announcements have included a canopy skywalk and walking tracks to minimise the impact on the environment, passive recreation spaces and bushland areas, and adventure- and water-based recreation opportunities aimed at young locals.

“A project of this scale requires commitments and contributions from many sources and is being partly funded by the NSW Government through the NSW Stronger Communities grant scheme and also by developer contributions,” Ruddock said.

Since Quarry last reported on the project’s developments in April, a further $35 million has been sourced to fund the project, with $50 million still to go.

Ruddock said feedback from the community had been largely positive, as the project gets closer and closer to being a reality.

“The community feedback expressed a high level of support for the draft Master Plan’s vision for the park, particularly its balance of ‘active’ and ‘passive’ recreation activities and its restoring and protecting the natural environment,” Ruddock said.

“This excellent outcome has been, of course, the result of good planning, extensive consultation with the community and support from both State and Commonwealth governments, creating an exceptional opportunity for Hornsby Shire.”

The first stage of the project is due to open in late 2023 with early settler relics, remnant buildings of the crushing plant and the existing Hornsby Aquatic & Leisure Centre to all play a part.

Watch video

More reading

Parkland plans revealed for restored Sydney quarry

Milestone for Hornsby Quarry rehabilitation

Hornsby Quarry spoil upgrade commences

Black Clay Pit: From sinkhole to community asset

 

Tags: Hornsby ParkHornsby QuarryHornsby Shire Councilold quarryPhilip Ruddockquarry remediationquarry voidrecreation centrerehabilitation projectremediation
Premium Ad
9

$30,000

2014 CATERPILLAR D10 U BLADE Full Widening

  • » Listing Type: Used
Location marker The shape of a location marker

Noosaville, QLD

07 5353 5418
MORE DETAILS
Premium Ad
30

$229,950

JOHN DEERE 450P XLT

  • » Listing Type: Used
  • » Class: Crawler
  • » Hours: 15.00
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
Premium Ad
15

$186,000

2019 CASE 1650M

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2019
  • » Hours: 3575
Location marker The shape of a location marker

Parkes, NSW

0488 850 314
MORE DETAILS
Premium Ad
17

$770,000

2023 CATERPILLAR D8

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2023
  • » Hours: 2522
Location marker The shape of a location marker

Redland Bay, QLD

07 3171 1034
MORE DETAILS
Premium Ad
14

$158,000

CATERPILLAR D7H

  • » Listing Type: Used
  • » Class: Crawler
  • » Hours: 26000
Location marker The shape of a location marker

Parkes, NSW

0488 850 314
MORE DETAILS
Premium Ad
32

$225,000

$2,700

per week (HIRE)

2018 KOMATSU D37EX-24

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2018
  • » Hours: 750
  • » Operating Weight Without Ripper - kg: 8,900
Location marker The shape of a location marker

Trafalgar, VIC

03 9998 4663
MORE DETAILS
Premium Ad
9

$24,000

2025 GESSNER 3.0 METRE D6 SINGLE TYNE CUTTER BAR

  • » Listing Type: New
Location marker The shape of a location marker

Torrington, QLD

07 3073 8040
MORE DETAILS
Premium Ad
27

$259,950

JOHN DEERE 550 P

  • » Listing Type: New
  • » Class: Crawler
  • » Hours: 15.00
Location marker The shape of a location marker

Austral, NSW

02 6171 3056
MORE DETAILS
Premium Ad
14

$350,000

2011 CATERPILLAR D10T

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2011
Location marker The shape of a location marker

Dubbo, NSW

02 8315 0022
MORE DETAILS
Premium Ad
28

$145,000

1988 CATERPILLAR D8N

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 1988
  • » Hours: 23527
  • » Operating Weight Without Ripper - kg: 37,462
Location marker The shape of a location marker

Gracemere, QLD

0485 931 106
MORE DETAILS
Premium Ad
7
Private Advertiser

$55,000

1987 CASE 1150D

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 1987
  • » Hours: 4900
  • » Operating Weight Without Ripper - kg: 12,000
Location marker The shape of a location marker

Berry, NSW

**** *** 503
MORE DETAILS
Premium Ad
4

$1,370,000

2010 CATERPILLAR D11T GEB

  • » Listing Type: Used
  • » Class: Crawler
  • » Year: 2010
  • » Hours: 59750
  • » Operating Weight Without Ripper - kg: 105,000
Location marker The shape of a location marker

Noosaville, QLD

07 5353 5418
MORE DETAILS

Related Posts

Lippmann

Power Meets Precision: The Lippmann 4654i-tr Recirculating Impactor Plant

by Supplied
December 12, 2025

Tricon Equipment showcases the Lippmann 4654i-tr Recirculating Impactor Plant which excels in applications involving heavy-duty crushing. When it comes to...

Boral Cement

Boral secures ‘significant’ funding for Berrima Cement Works

by Adam Daunt
December 12, 2025

Boral has confirmed it has secured funding from the New South Wales government to support its alternative fuel project at Berrima Cement...

QME

Mackay locked and loaded for QME 2026

by Henry Ballard
December 11, 2025

The Queensland Mining & Engineering Exhibition (QME) is set to return in July 2026, and anticipation is building in the...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Quarry is the official magazine of the Institute of Quarrying Australia (IQA), the peak body for the sector, and informs decision makers about the latest industry news.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Quarry

  • About
  • Advertise
  • Subscribe
  • Contact
  • Latest Magazine
  • List Your Equipment Today
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Products
  • Operations
  • In Depth
  • Opinion

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Latest News
    • IQA News
    • Regulation News
    • People on the Move
  • Products
  • Operations
    • Attachments
    • Recycling
    • Maintenance
    • Conveying
    • Sand Processing
    • Drill & Blast
    • Mobile Plant
    • Load & Haul
    • Screens & Feeders
    • Crushing
  • In Depth
    • Safety
    • Training
    • Business Management
    • Case Studies
    • Opinion
    • Geology Talk
  • DIRECTORY
  • List Stock
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited