A ‘set-and-forget’ drive solution was what a lime quarry in New South Wales was looking for when they contacted their trusted industrial suppliers, BSC, to help re-design a blower drive conveying aglime out of the quarry.
Matt Thornton, major account manager at BSC recommended the Gates Predator v-belts, which do not require any re-tensioning after the initial installation. The v-belts are also designed to allow for momentary slippage during overloads, without damaging the belt.
To read the full article, click here.